What to Expect During the Roof Replacement Process After a Storm


After a storm, replacing your damaged roof can feel overwhelming, especially if it’s your first time navigating the process. Here’s a breakdown of the typical steps involved in roof replacements after storms and what you can expect from each stage.
Step 1: Initial Inspection
Purpose: The first step in any roof replacement is a thorough inspection to assess the damage.
What to Expect: A roofing professional will inspect the interior and exterior of your home, checking for visible signs of damage, including missing shingles, water stains, or structural issues.
Timing: Typically, the inspection occurs shortly after the storm, but it’s important to schedule it as soon as possible to prevent further damage.
Step 2: Insurance Claim Assessment
Purpose: If you have homeowner’s insurance, your policy may cover the cost of repairs or replacement.
What to Expect: Your insurance company will assess the damage and determine the coverage. The roofing company will often assist with filing the claim and providing documentation of the damage.
Timing: This step can take a few days to a week, depending on the insurance process.
Step 3: Removal of Old Roofing
Purpose: The existing roofing material, whether it’s shingles, tiles, or metal, will be removed.
What to Expect: This stage involves the complete removal of the old roof, including shingles, underlayment, and any damaged materials.
Timing: The removal usually takes 1–2 days, depending on the roof size and complexity.
Step 4: Roof Deck Inspection and Repair
Purpose: Once the old materials are removed, the roof deck will be inspected for any underlying damage.
What to Expect: The contractor will check for rot, mold, or structural damage and make any necessary repairs to the decking before installing the new roof.
Timing: This step can take an additional day or two, depending on the extent of the damage.
Step 5: Installation of New Roofing
Purpose: Once the deck is prepared, the new roof will be installed, including the underlayment and chosen materials.
What to Expect: The installation process includes laying down the new material (e.g., shingles, tiles, or metal panels), ensuring proper sealing and waterproofing.
Timing: The installation typically takes 1–3 days, depending on the roofing material and complexity.
Step 6: Final Inspection and Cleanup
Purpose: After installation, the roofing company will conduct a final inspection to ensure everything is up to code and securely installed.
What to Expect: You’ll also receive a detailed cleanup of debris and materials left behind, leaving your home ready for the next storm season.
Timing: The final inspection and cleanup take about a day, after which the project will be completed.
For more details on the roof replacement process after storms, refer to our guide on Roof Replacements After Storms.
✅ Ready to replace your storm-damaged roof?
Contact LongBoat Key Roofing today for a free inspection and expert emergency roof repair services.
Subscribe to my newsletter
Read articles from LongBoat Key Roofing directly inside your inbox. Subscribe to the newsletter, and don't miss out.
Written by