Overcoming Common Challenges in Applying Waterproofing Materials

In construction projects, waterproofing materials are essential for protecting structures from moisture and damage. However, engineers and contractors often face challenges that affect the quality and effectiveness of waterproofing applications.
١. عدم تحضير السطح بشكل صحيح
أحد الأسباب الرئيسية لفشل أنظمة العزل هو عدم تنظيف وتجهيز السطح بشكل مناسب قبل التطبيق. الأسطح الملوثة بالغبار، الزيوت، أو المواد غير المتماسكة تمنع التصاق مواد العزل بشكل جيد.
1. Improper Surface Preparation
One of the primary reasons for waterproofing failure is inadequate surface preparation. Surfaces contaminated with dust, oils, or loose particles prevent proper adhesion of waterproofing materials.
To read the full article:
https://aboalhoda52gmail.wordpress.com/2025/07/01/overcoming-common-challenges-in-applying-waterproofing-materials/
Another link:
https://www.astm.org/c0267-20.html
https://www.astm.org/d4541-17.html
https://www.astm.org/g0154-23.html
https://hashnode.com/post/cmdo8s0r4000002l1gkf1feiw
https://hashnode.com/post/cmdpmjmxj000102lbc3ewhwkn
Eng. Mohamad Alshahatha
Waterproofing & Construction Chemicals Specialist
LinkedIn: https://www.linkedin.com/in/mohamad-alshahatha-63735a245
🔹 WordPress: https://aboalhoda52gmail.wordpress.com
🔹Hashnod
https://buildingchem.hashnode.dev/
🔹 Medium: https://medium.com/@aboalhoda52
Subscribe to my newsletter
Read articles from Eng.Mohamad Alshahatha directly inside your inbox. Subscribe to the newsletter, and don't miss out.
Written by

Eng.Mohamad Alshahatha
Eng.Mohamad Alshahatha
Chemical and Industrial Engineer with strong expertise in construction chemicals, waterproofing systems, and detergents manufacturing. Member of the Syrian Chemical Society.