How to Choose Between a 120 TPH and 180 TPH Asphalt Plant for a 20 km Highway Project?

aimixgroupaimixgroup
4 min read

Choosing the right asphalt plant capacity is a critical decision for any highway construction project. For a 20 km road, this choice affects not only your project timeline but also your overall costs and efficiency. Many contractors face a dilemma: should they invest in a 120 TPH (tons per hour) plant or opt for a larger 180 TPH asphalt mixing plant for sale? In this article, I will guide you through practical considerations to help you make an informed choice that fits your project needs perfectly.

Understanding Your Project Scope and Timeline

The first step is to understand the scope of your 20 km highway project. Consider the planned pavement thickness, lane width, and number of lanes. These factors influence the total asphalt volume required. Next, review your project timeline and deadlines.

Why does this matter? Because production capacity directly impacts how fast you can lay the asphalt. A 180 TPH plant can produce 50% more asphalt per hour than a 120 TPH plant. Therefore, if you face tight deadlines, the higher capacity might save you valuable time.

Estimating Asphalt Volume and Daily Production

Calculate the total amount of asphalt needed by multiplying the length, width, and thickness of the pavement, then convert this volume to tons based on the asphalt density. For example, a 20 km highway with two lanes of 3.5 meters width each and 0.1 meters thickness may require roughly 14,000 tons of asphalt.

Next, estimate your daily production requirement. If your deadline requires completing the project in 30 days, you must produce approximately 467 tons per day. A 120 TPH hot mix plant for road construction running 8 hours per day can produce about 960 tons, which meets your needs comfortably. However, if your working hours are limited or the timeline is shorter, a 180 TPH plant offers extra buffer.

Balancing Cost with Efficiency

After assessing your production needs, you must weigh the cost implications. Generally, a 180 TPH asphalt plant costs more upfront and consumes more fuel and maintenance resources. However, it can reduce labor costs and shorten project duration.

In contrast, a 120 TPH plant requires a smaller initial investment and lower operating costs but may extend your project timeline. This trade-off means you should consider your budget constraints alongside your schedule.

Energy Consumption and Maintenance Considerations

Higher capacity plants like the 180 TPH often have larger burners and higher energy consumption. Yet, newer models incorporate energy-saving technologies to mitigate this. Maintenance complexity may increase slightly with plant size, so ensure you have skilled technicians or supplier support ready.

Site Conditions and Logistics

Another important factor is your project site’s conditions. Space availability, power supply, and accessibility affect the choice of plant size. A 120 TPH plant usually has a smaller footprint and may be easier to transport and install, which benefits projects with restricted or challenging sites.

On the other hand, a 180 TPH plant needs more space and infrastructure but reduces the number of trips required to transport asphalt, saving transportation costs.

Availability of Skilled Operators

Operating larger plants requires trained operators familiar with complex controls and safety standards. If your team lacks experience, starting with a 120 TPH plant might be safer and more practical.

Future Expansion and Project Pipeline

Lastly, think about your company’s future projects. If you plan to take on larger or multiple highway projects soon, investing in a 180 TPH plant could be a wise long-term choice. It provides flexibility and scalability, ensuring you can meet growing demand without delays.

However, if this 20 km highway is a one-off project, a 120 TPH plant might offer better return on investment without unnecessary capacity.

Conclusion: Making the Right Choice for Your Highway Project

In summary, the decision between a 120 TPH and 180 TPH asphalt plant depends on your project size, timeline, budget, site conditions, and future plans. A 120 TPH plant suits projects with moderate volume, limited space, and tighter budgets. Meanwhile, a 180 TPH plant fits large-scale projects demanding high efficiency and faster completion.

To make your choice easier, consider running detailed calculations on your asphalt volume, daily production needs, and total project timeline. Additionally, analyze your budget, logistics, and workforce readiness.

If you want expert advice or tailored solutions, our team at AIMIX(an outstanding asphalt mixing plant supplier) is ready to assist. We provide reliable asphalt plants with flexible configurations and local support to ensure your highway project runs smoothly and cost-effectively. Contact us today to discuss which asphalt plant capacity best fits your needs and get a customized quote.

Choosing wisely today will save you time and money tomorrow. Let's build a stronger road together!

0
Subscribe to my newsletter

Read articles from aimixgroup directly inside your inbox. Subscribe to the newsletter, and don't miss out.

Written by

aimixgroup
aimixgroup

AIMIX GROUP AIMIX GROUP is a professional construction machinery manufacturer and exporter with more than 10 years of experience. We focus on providing complete solutions for concrete, asphalt, crushing, and other construction needs. Our main products include: Concrete batching plants Self-loading concrete mixers Asphalt mixing plants Stone crushers and screening plants Concrete pumps and mixer pumps We serve customers in over 100 countries with CE/ISO-certified equipment, customized solutions, and strong after-sales support. AIMIX – Your Reliable Partner in Construction Machinery.